A successful launch is only the start. Value arrives when people change the way they work.
Compare your current adoption path with a faster one. See what could arrive sooner—and what still needs to be proven.
Build your value caseYour assumptions. Transparent maths. No promised uplift.
No sign-up · No data sentValue brought forward
Base scenario$120,000
Additional modeled benefit within 24 months, versus the baseline.
A timing comparison, not an ROI or a causal claim. Support costs and implementation risks are not deducted.
02 — COMPARE
Same destination.
Different arrival.
The shaded gap is the benefit brought forward—not a new benefit to add on top.
Monthly benefit rate ($), after realization · continuous linear adoption paths
View monthly figures
| Month | Baseline | Base | Brought forward |
|---|
Faster isn’t the same as frictionless.
$240,000 remains delayed within this horizon on the base path, compared with immediate full adoption.
Validate the ramp with the people doing the work. Test whether saved time can be redeployed, who owns the outcome, and what support will cost.
03 — PRESSURE-TEST
A useful estimate.
Not a promise.
The model makes the cost of timing visible. Your evidence determines whether the faster path is plausible.
How the maths works
Usable monthly benefit = full-adoption monthly benefit × realization.
Adoption at time t = min(t ÷ ramp months, 1). A zero-month ramp means immediate full adoption.
Benefit in the horizon = usable monthly benefit × area under the adoption path, from month 0 to the horizon.
Value brought forward = faster-path benefit − baseline benefit. Nothing beyond the horizon is counted.
For horizon H and ramp R: the area is H² ÷ (2R) when H ≤ R; otherwise H − R/2. When R = 0, the area is H. Monthly figures use the difference between consecutive cumulative areas.
What is—and isn’t—in the model
- Both paths begin at zero adoption today, rise linearly, and retain full adoption once reached—except a zero-month ramp, which starts fully adopted. Use this tool for a new rollout, not an existing adoption baseline.
- The same benefit pool and realization rate apply to every scenario. Only timing changes. There is no empirically established uplift embedded in the tool.
- Realization captures benefit usability independently of adoption. If your monthly input already includes this discount, set realization to 100%.
- Costs, discounting, taxes, delivery probability, deterioration and negative outcomes are not modeled. This is gross timing value, not net present value, ROI or a business-case approval.
- Delayed value is the shortfall within the chosen horizon versus immediate full adoption. It is not necessarily permanently lost, and it must not be added to the timing uplift.
Avoid counting the same benefit twice
Use either a validated financial benefit pool or the optional time-saved capacity estimate—not both for the same activity. Don’t add saved labour time to revenue or margin benefits already generated by that time.
Loaded-cost capacity is not cash saving. Cash savings require a separate, credible mechanism such as reduced spend. Redeployable time, extra output and reduced costs need different evidence.
Define eligible employees carefully, exclude unaffected roles, and check whether the same saved hours appear in another initiative. Rework and productivity benefits are not separate automatic add-ons.
What to verify before funding support
- Agree the eligible population and one defensible benefit pool with its owner.
- Ground baseline and faster ramp durations in a pilot, prior rollout or explicit delivery plan.
- Test realization with actual workflow evidence—not just attendance, logins or training completion.
- Compare the incremental value with all incremental costs and risks outside this tool.
←